The changes in the initial design played a crucial role in
the influence of the failure and eventually collapse of the department store as
these changes were not sanctioned or authorised by the engineers during the
building planning stages. The results of the research of conducted demonstrated
that had the individuals employed to work on the project at the time made an
ethical decision to terminate the project while it was still in its initial
planning/design stage the risk of collapse would have decreased. Instead
selfish decision was made to go on with the construction of a faulty department
store. The failure present is that of punching shear force a type of a
mechanical failure which exists in support this failure is due to shear. To
ensure structural stability punching shear reinforcement is essential when
applying a flat stab support and keep them up right. Increasing its compressive
and tensile strength. The initial plans suggested that 80cm columns were to
be  

compromised in material usage. It is an engineer role to
calculate where the rebar is to be allocated however this was not apparent in
the design work or construction as the rebar was moved 5cm away from its
initial designed position affected its strength by 20%. If any form results in
catastrophic failure which is non-reversible structural engineers who perform
continues design and maintenance checks throughout the years should pick up on
any visible failures. The death toll could have been prevented had the store
owner made the right decision to evacuate the building in time. Poor leadership
and business management of the project eventually lead to poor construction of
the building thus the building collapsed. This could had been avoided if the
project had followed the correct building plan limitations and safety
regulations while adhering to a correct design which hints for a safe and
functioning building